KM3NeT - ORCA sea campaigns

Liveblogs during sea campaigns for ORCA.

ORCA is operational

8 March 2019 – Last month, the KM3NeT team of CPPM, Marseille together with the ship crews successfully installed an ORCA detection unit. It was the first unit connected to the refurbished main electro-optical cable to shore. After a few weeks of technology tests, the unit is given free for physics runs. ORCA is operational! Read more





KM3NeT-Fr – Cable comes to shore

KM3NeT-Fr: Laying the MEOC toward the powerhut at the beach

23 Dec 2014: For KM3NeT-Fr, about 45 km off-shore Toulon, France, the Main Electro-Optical Cable (MEOC) connecting the deep-sea infrastructure with the shore was deployed. Read more


Qualification of KM3NeT String Deployment method

KM3NeT-LOM test

15 Apr 2013: During the first two weeks of April, an extensive qualification programme has been executed to qualify the novel string deployment method of KM3NeT.

Short videos demonstrating the concept of deployment can be found in our YouTube channel and playlists.