27 Apr 2015: In the early morning of 27th April 2015, the first node of the seafloor network at the KM3NeT-Fr site was successfully installed. This is again an important step in the realisation of the KM3NeT neutrino telescope. Read more
KM3NeT - infrastructure
KM3NeT-Fr – Cable comes to shore
23 Dec 2014: For KM3NeT-Fr, about 45 km off-shore Toulon, France, the Main Electro-Optical Cable (MEOC) connecting the deep-sea infrastructure with the shore was deployed. Read more