ORCA6 completed
With the installation of two more detection units at the French site of KM3NeT, the first phase of building the ORCA detector is completed! Since 27 January 2020, the detector is taking data with six detection units. Read more
Liveblogs during sea campaigns for ORCA.
With the installation of two more detection units at the French site of KM3NeT, the first phase of building the ORCA detector is completed! Since 27 January 2020, the detector is taking data with six detection units. Read more
28 May 2019 – The KM3NeT/ORCA detector is now running with two detection units. The two units were installed during a recent deployment campaign. The KM3NeT researchers are eagerly analysing the recorded signals, while preparing the deployment of a further set of detection units. Read more
8 March 2019 – Last month, the KM3NeT team of CPPM, Marseille together with the ship crews successfully installed an ORCA detection unit. It was the first unit connected to the refurbished main electro-optical cable to shore. After a few weeks of technology tests, the unit is given free for physics runs. ORCA is operational! Read more
23 Dec 2014: For KM3NeT-Fr, about 45 km off-shore Toulon, France, the Main Electro-Optical Cable (MEOC) connecting the deep-sea infrastructure with the shore was deployed. Read more